AI data centers use a lot of electricity because the GPU servers that train and run AI models draw several times more power than ordinary servers, and they run in dense racks that also need heavy cooling. In the U.S., data centers used about 4.4% of all electricity in 2023. Lawrence Berkeley National Laboratory projects 6.7% to 12% by 2028, mostly because of AI [1][2].
How much electricity are we talking about?
United States. Data center electricity use rose from 58 TWh in 2014 to 176 TWh in 2023 [2]. LBNL's scenarios put 2028 between roughly 325 and 580 TWh. At an average utilization of 50%, that is 74 to 132 gigawatts of demand [1].
Worldwide. The International Energy Agency (IEA), in its April 2025 Energy and AI report, estimates data centers used about 415 TWh in 2024, roughly 1.5% of global electricity. It projects that more than doubling to about 945 TWh by 2030, slightly more than Japan's total electricity consumption today [3].
The U.S. trend is visible in grid forecasts. EIA's November 2026 outlook expects U.S. electricity generation to hit a record of almost 4,390 billion kWh in 2026, up 2.7%, driven by growing commercial-sector demand and a hot summer [6]. EIA has identified data centers as a major source of near-term demand growth, especially in the ERCOT (Texas) and PJM (Mid-Atlantic and Midwest) grid regions [7].
Where the power goes inside an AI data center
The servers
LBNL's numbers show how fast AI hardware took over the load. U.S. server electricity use roughly tripled from about 30 TWh in 2014 to nearly 100 TWh in 2023. GPU-accelerated AI servers went from under 2 TWh in 2017 to more than 40 TWh in 2023 [1].
The reason is power per box. LBNL's model uses a rated power of about 10.2 kW for an NVIDIA H100-class eight-GPU server and 12.2 kW for the B100 class. That compares with 3.4 kW for lighter inference cards [1]. For why GPUs dominate this work, see our explainer on AI chips vs CPUs vs GPUs vs TPUs.
The racks and cooling
Packing those servers together creates dense heat. Uptime Institute's 2025 survey found most operators' densest racks still run below 30 kW, but some cabinets now exceed 100 kW [8]. Above a few tens of kilowatts per rack, air cooling struggles and liquid cooling becomes the norm. Cooling and power conversion add overhead on top of the IT load. Our guide to sustainable data centers covers how operators measure and cut that overhead.
Training vs inference
Training builds a model. Inference runs it to answer requests. (Our explainer on AI model training vs inference covers the difference in depth.)
- In 2023, LBNL found that most AI servers were used for inference, and that inference servers used nearly 60% of AI server energy [1].
- By 2028, LBNL expects training to overtake inference, at 50% to 53% of AI server energy, as more of the most power-hungry GPUs go to training [1].
What does one AI model or one prompt cost?
Training a large model. A 2021 paper by Google and UC Berkeley researchers estimated that training GPT-3 used about 1,287 MWh and emitted about 552 tonnes of CO2-equivalent [4]. That is roughly what 119 average U.S. homes use in a year, based on EIA's figure of 10,791 kWh per household (simple division) [9]. Today's frontier models are larger, and their developers rarely publish training energy.
A single prompt. In August 2025, Google estimated that the median text prompt in its Gemini Apps uses 0.24 watt-hours, emits 0.03 grams of CO2-equivalent and consumes 0.26 milliliters of water. It said the energy per median prompt fell 33-fold over the previous 12 months (company-reported) [5]. Per-prompt numbers are small. The aggregate is large because the number of prompts, and the size of the models answering them, keeps growing.
Measure | Figure | Source |
|---|---|---|
U.S. data center use, 2023 | 176 TWh (4.4% of U.S. electricity) | LBNL [1] |
U.S. data center use, 2028 (projected) | 325โ580 TWh (6.7โ12%) | LBNL [1] |
Global data center use, 2024 | 415 TWh (1.5%) | IEA [3] |
Global data center use, 2030 (base case) | ~945 TWh | IEA [3] |
GPT-3 training (2020-era estimate) | ~1,287 MWh | Patterson et al. [4] |
Median Gemini text prompt (2025) | 0.24 Wh | Google [5] |
Why the grid feels it
Data centers are large, concentrated loads that want power quickly. That collides with how slowly new supply gets connected. LBNL's interconnection study found that the median power project built in 2025 took about five years from interconnection request to commercial operation. About 2,061 GW of generation and storage capacity was waiting in U.S. queues at the end of 2025 [10]. (Large loads like data centers have separate queues, which that study doesn't cover [10].)
EIA's analysis suggests that if data center demand grows faster than grid operators expect, the near-term gap would likely be filled by existing fossil-fuel plants running more, because new capacity can't be built fast enough [7]. That is the main reason AI's energy use has become a climate question and not just a utility-planning one.
What could bend the curve
- More efficient chips and models. Google's reported 33-fold drop in energy per prompt in one year shows how quickly software and hardware can improve [5].
- Better utilization. LBNL notes that idle power for many servers still runs at 20% to 25% of maximum [1]. Keeping expensive GPUs busy cuts energy per task.
- Cooling choices. Liquid cooling lowers overhead in dense racks [8].
- Flexible demand. Some training jobs can shift to hours or regions with spare clean power.
Efficiency gains also tend to lower the cost of AI, which can raise total usage. That's why most forecasts still rise despite the improvements.
Why forecasts disagree
LBNL's 2028 range spans almost a factor of two for three reasons [1]:
- GPU shipments. How many accelerators manufacturers can actually ship.
- Operating practices. How intensively the installed GPUs are used.
- Cooling. Which cooling systems new facilities adopt.
LBNL also stresses that the lack of public data on AI energy use limits any estimate [1]. Treat precise-sounding single numbers, especially in headlines, with caution.
Outlook
The direction is clear, even if the magnitude isn't. LBNL expects U.S. data center demand to roughly double or triple by 2028 [1][2], and the IEA expects global data center use to more than double by 2030 [3]. These are projections, not certainties. Where that power comes from is the open question, and it's why AI companies are signing deals for new solar, storage and nuclear capacity. For one firm-power option, see our explainer on small modular reactors.
Frequently asked questions
How much electricity does AI use?
There's no exact figure for AI alone. U.S. GPU-accelerated AI servers used more than 40 TWh in 2023, not counting cooling and other overhead [1]. All U.S. data centers together used about 176 TWh that year [2].
How much energy does one ChatGPT or Gemini prompt use?
Google has published a detailed per-prompt estimate along with its methodology: 0.24 watt-hours for a median Gemini Apps text prompt in 2025 (company-reported) [5]. Energy per prompt depends on model size, hardware and how the measurement is drawn, so figures from different providers aren't directly comparable.
Does training or inference use more energy?
In 2023, inference used nearly 60% of U.S. AI server energy. LBNL expects training to take a slight majority by 2028 [1].
Will AI data centers raise electricity bills?
That depends on how utilities and regulators allocate the cost of new generation and transmission. EIA expects data centers to be a major driver of demand growth in regions like ERCOT and PJM [7], and new demand can raise costs if supply lags.
Why can't data centers just use renewable energy?
Many do contract for renewables. The difficulty is matching round-the-clock AI loads with variable supply, and connecting new projects fast enough; median interconnection times now run about five years [10].
Sources
- Shehabi, A., et al., "2024 United States Data Center Energy Usage Report," Lawrence Berkeley National Laboratory, December 2024. https://escholarship.org/uc/item/32d6m0d1
- U.S. Department of Energy, "DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers," December 20, 2024. https://www.energy.gov/articles/doe-releases-new-report-evaluating-increase-electricity-demand-data-centers
- International Energy Agency, "Energy and AI: Executive summary," April 2025. https://www.iea.org/reports/energy-and-ai/executive-summary
- Patterson, D., et al., "Carbon Emissions and Large Neural Network Training," arXiv:2104.10350, 2021. https://arxiv.org/abs/2104.10350
- Vahdat, A., and Dean, J., "How much energy does Google's AI use? We did the math," Google Cloud blog, August 21, 2025. https://cloud.google.com/blog/products/infrastructure/measuring-the-environmental-impact-of-ai-inference
- U.S. Energy Information Administration, Short-Term Energy Outlook, "Electricity, coal, and renewables," released November 10, 2026. https://www.eia.gov/outlooks/steo/report/elec_coal_renew.php
- U.S. Energy Information Administration, "Fossil generation could rise with faster-than-expected growth in data center power demand," Today in Energy, March 12, 2026. https://www.eia.gov/todayinenergy/detail.php?id=67344
- Uptime Institute, "Uptime Institute Global Data Center Survey 2025." https://datacenter.uptimeinstitute.com/rs/711-RIA-145/images/2025.Annual.Survey.Report.pdf
- U.S. Energy Information Administration, "How much electricity does an American home use?" FAQ (2022 data). https://www.eia.gov/tools/faqs/faq.php?id=97&t=3
- Rand, J., et al., "Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025," Lawrence Berkeley National Laboratory, June 2026. https://eta-publications.lbl.gov/sites/default/files/2026-06/queued_up_2026_edition.pdf