LIVE·The trends shaping tomorrow's world.
Green Tech

Geothermal Energy Technology Explained

How geothermal plants turn underground heat into power, the three plant types, heat pumps and direct use, and how enhanced geothermal could expand the map.

Geothermal energy technology taps the heat stored in the Earth to generate electricity or to heat and cool buildings directly. Power plants drill wells into hot underground water or rock, bring the heat to the surface as steam or hot water, and use it to spin a turbine [5]. Because that heat doesn't depend on the weather, geothermal plants can run 24 hours a day, seven days a week [1]. The catch is geography: today's plants need hot water and permeable rock close enough to the surface, which is why newer "enhanced" systems that engineer their own reservoirs get so much attention.

In 2025, U.S. geothermal plants produced about 16 billion kilowatthours, roughly 0.4% of total U.S. utility-scale electricity generation, from plants in seven states [4].

Where the heat comes from

Heat exists in rock everywhere. EIA notes that the slow radioactive breakdown of elements "happens naturally in all rocks," and that "the deeper you go, the hotter the rocks and water" [6]. The hottest resources near the surface sit where tectonic plates meet, because magma rises closer to the surface there; that's also where volcanoes occur [6].

That explains the U.S. map. In 2025, California produced 68.6% of U.S. geothermal electricity and Nevada 24.7% [4]. Geothermal supplied 5.2% of California's electricity and 8.6% of Nevada's that year [4].

The four ways geothermal energy is used

DOE's Office of Geothermal (formerly the Geothermal Technologies Office) describes a spectrum of uses, from deep power plants to shallow systems under a backyard [1]:

Use

Depth and temperature

What it does

Power plants (hydrothermal)

Deep wells into naturally hot, permeable reservoirs

Generate electricity around the clock [1][5]

Enhanced geothermal systems (EGS)

Deep hot rock without enough natural fluid or permeability

Engineer a reservoir to make power where none existed [2]

Direct use and district heating

Low-temperature resources (DOE groups district heating with low-temperature systems, under 300°F)

Heat buildings, campuses or industrial processes directly [1]

Geothermal heat pumps

Shallow ground near the surface

Use the ground as a heat source in winter and a heat sink in summer [1]

Direct use has a long U.S. history: Boise, Idaho, has used geothermal district heating since 1892 [1]. Heat pumps are a different technology from power plants: they exchange heat with shallow ground rather than drilling to hot reservoirs [1].

How geothermal power plants work

Geothermal power plants draw from wells that can be as deep as 2 miles and work with fluids at roughly 300°F to 700°F [5]. EIA describes three plant designs [5]:

Plant type

How it works [5]

When it's used

Dry steam

Uses steam straight from the reservoir to spin the turbine

Reservoirs that yield steam directly; the first geothermal power plant, built in Italy in 1904, used natural steam

Flash steam

High-pressure hot water rises, its pressure drops and part of it "flashes" into steam that drives the turbine

The most common type

Binary cycle

Hot geothermal water heats a second liquid with a lower boiling point, which vaporizes and drives the turbine; the geothermal water never touches the turbine and goes back underground

Uses a working fluid with a lower boiling point than water

Binary plants matter for the future of geothermal because the geothermal water stays out of the turbine and goes back underground [5]. Fervo Energy, for example, says its Cape Station in Utah uses "modern binary cycle geothermal power plants" (company claim) [9].

Enhanced geothermal systems (EGS)

Conventional geothermal needs three things to line up: heat, water and rock permeable enough for the water to flow. Hot rock is common. Hot rock that's already full of flowing water is not.

EGS solves the missing pieces with engineering. DOE explains that in an EGS, "fluid is injected deep underground under carefully controlled conditions to create new fractures." Water then circulates through the hot, fractured rock, heats up and is pumped back to the surface to generate electricity [2]. The national lab that leads much of this research, the National Laboratory of the Rockies (NLR, formerly NREL), puts it simply: EGS "facilitates the development of low-permeability geothermal resources" and "requires augmentation of reservoir permeability using stimulation techniques" [8].

DOE has supported several completed EGS demonstrations, at Newberry Volcano (Oregon), The Geysers (California), Brady and Desert Peak (Nevada) and Raft River (Idaho), and runs a dedicated field laboratory in Utah called FORGE, where researchers report "significant improvements in drilling rates and successful rock stimulation" [2].

The cost goal

In September 2022, DOE launched its Enhanced Geothermal Shot, a goal of "cutting its cost by 90% to $45 per megawatt hour by 2035" [3]. DOE said that tapping even a small share of U.S. geothermal heat could "affordably power over 40 million American homes," and that the country holds "more than five terawatts of heat resources" [3]. These are DOE goals and resource estimates, not forecasts of what will be built.

DOE's longer-range analyses give a sense of the ceiling. Its geothermal basics page cites a 2022 EGS analysis showing potential for 90 gigawatts of electricity by 2050, and the 2019 GeoVision analysis showing up to 60 gigawatts of generating capacity by 2050 [1].

The first commercial EGS plants

The leading U.S. test case is Fervo Energy's Cape Station in Beaver County, Utah. The following are company claims from Fervo's October 1, 2026 press release [9]:

  • The first 33 MW power block reached commercial operation on September 30, 2026, after first grid synchronization on September 24.
  • Phase I totals about 100 MW across three 33 MW units, with the other two expected to reach contractual commercial operation by January 1, 2027.
  • Phase II adds 400 MW, with commercial operation expected in 2028.
  • The company cites more than 1 gigawatt of binding power purchase agreements.

We cover Fervo's business separately in our reporting on its 2026 IPO, its $462 million raise and its earlier Nevada pilot.

Other next-generation approaches

EGS isn't the only route to "geothermal anywhere." NLR's research groups describe two more [8]:

  • Closed-loop geothermal (CLG). Wells drilled into hot rock circulate fluid through a sealed loop, so the fluid never mixes with the formation. NLR notes that heat production "can be estimated with relatively high confidence" and that because reservoir stimulation isn't needed, closed-loop systems limit induced-seismicity risk and lower water use. The challenge is "potentially complex downhole completions" [8].
  • Superhot rock. Extremely hot resources, which DOE defines as above 375°C [2], could deliver far more energy per well; where fluids reach supercritical conditions (above 400°C), NLR estimates output "up to 10 times that of a normal geothermal well," but notes these systems "have not yet been harnessed for power production" [8].

Approach

Needs natural water?

Needs fracturing?

Status

Conventional hydrothermal

Yes

No

Commercial for decades [1][5]

Enhanced geothermal (EGS)

No (water is injected)

Yes, controlled stimulation [2]

First commercial plants coming online (company claims) [9]

Closed-loop

No (sealed loop)

No [8]

Research and early projects

Superhot rock

Varies

Varies

Not yet harnessed for power [8]

How much geothermal capacity the U.S. has

EIA puts U.S. geothermal net summer capacity at about 2,714 MW as of September 2026 (preliminary), up from about 2,684 MW a year earlier [7]. DOE's 2022 Earthshot announcement described U.S. geothermal as generating "about 3.7 gigawatts" [3]. The two figures use different measures and dates (EIA's net summer capacity reflects what plants can deliver at summer peak), so compare like with like.

Benefits

  • Firm, around-the-clock power. Geothermal plants can run 24/7 regardless of weather [1], which complements wind and solar; see our explainers on wind energy technology and how solar panels work.
  • Multiple uses. The same resource can heat buildings, run industrial processes or generate power [1].
  • Large untapped resource. DOE describes more than five terawatts of U.S. heat resources [3].

Limitations and risks

  • Geography (for now). Conventional geothermal power is concentrated in a handful of western states; California and Nevada produced over 93% of U.S. geothermal electricity in 2025 [4].
  • Drilling costs. Wells are expensive. DOE notes that casing and cementing alone can make up around 30% to 40% or more of overall well costs [2].
  • Induced seismicity. Fracturing rock to create EGS reservoirs carries seismic risk that must be managed, which is one reason NLR highlights closed-loop designs that avoid stimulation [8].
  • Unproven at scale. Commercial EGS is just starting (company claims) [9], and superhot systems haven't produced power yet [8].
  • Small share today. About 0.4% of U.S. utility-scale generation in 2025 [4].

How to read geothermal headlines

  1. Conventional or next-generation? A new flash plant at a known reservoir is very different from an EGS or closed-loop first.
  2. Who's making the claim? Separate company press releases [9] from government data [4][7].
  3. Capacity, contracted or operating? Contracted PPAs and planned phases aren't operating megawatts.
  4. Heat pumps vs power plants. "Geothermal" in a home-heating story usually means ground-source heat pumps, not power generation [1].

Outlook

DOE's targets and NLR's research agenda point the same way: cheaper drilling, reliable reservoir stimulation and new designs that work outside today's hot spots [2][3][8]. Whether EGS reaches DOE's $45/MWh goal by 2035 is an open question [3]. The next two years of operating data from the first commercial EGS plants will tell investors and grid planners more than any forecast. For other firm, low-carbon options, see our explainer on small modular nuclear reactors.

Frequently asked questions

How does a geothermal power plant make electricity?

It pipes hot water or steam up from wells that can be up to 2 miles deep and uses it, directly or by heating a second fluid, to spin a turbine connected to a generator [5]. In binary plants, the geothermal water is returned to the earth [5].

What is an enhanced geothermal system?

An EGS creates a geothermal reservoir where nature didn't provide one, by injecting fluid under controlled conditions to open fractures in hot, dry or low-permeability rock, then circulating water through it to collect heat [2][8].

How much U.S. electricity comes from geothermal?

About 0.4% of U.S. utility-scale generation in 2025, or roughly 16 billion kilowatthours, according to EIA [4].

Are geothermal heat pumps the same as geothermal power?

No. Heat pumps use the stable temperature of shallow ground to heat and cool buildings [1]. Geothermal power plants drill much deeper to reach water hot enough to generate electricity [5].

Can geothermal cause earthquakes?

Creating an EGS reservoir means stimulating rock under carefully controlled conditions [2], and that stimulation carries induced-seismicity risk. NLR notes that closed-loop designs, which don't require stimulation, limit that risk [8].

Sources

  1. U.S. Department of Energy, Office of Geothermal, "Geothermal Basics." https://www.energy.gov/eere/geothermal/geothermal-basics
  2. U.S. Department of Energy, Office of Geothermal, "Enhanced Geothermal Systems." https://www.energy.gov/eere/geothermal/enhanced-geothermal-systems
  3. U.S. Department of Energy, "DOE Launches New Energy Earthshot to Slash the Cost of Geothermal Power," September 8, 2022. https://www.energy.gov/articles/doe-launches-new-energy-earthshot-slash-cost-geothermal-power
  4. U.S. Energy Information Administration, "Use of geothermal energy." https://www.eia.gov/energyexplained/geothermal/use-of-geothermal-energy.php
  5. U.S. Energy Information Administration, "Geothermal power plants." https://www.eia.gov/energyexplained/geothermal/geothermal-power-plants.php
  6. U.S. Energy Information Administration, "Geothermal explained." https://www.eia.gov/energyexplained/geothermal/
  7. U.S. Energy Information Administration, Electric Power Monthly, "Table 6.2.B. Net Summer Capacity Using Primarily Renewable Energy Sources and by State," September 2026 and 2025. https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=epmt_6_02_b
  8. National Laboratory of the Rockies, "Next-Generation Geothermal." https://www.nlr.gov/geothermal/next-generation
  9. Fervo Energy, "Fervo Energy Declares Commercial Operation at Cape Station Ahead of Schedule, Leading the Race for Next-Generation Geothermal Energy," press release, October 1, 2026. https://fervoenergy.com/fervo-energy-declares-commercial-operation-at-cape-station-ahead-of-schedule-leading-the-race-for-next-generation-geothermal-energy/